Skip to main content

Lanky Landscaping

How to Read a Landscaping Quote and Compare Three Fairly

Read a Landscaping Quote

You asked three landscapers for the same patio. One came back at £4,200, one at £6,800, and one at £9,500.The natural reaction is that somebody is overcharging. Sometimes that is true. Far more often, the three quotes describe three genuinely different jobs, and the cheapest one is missing work that will either be added later as an extra or simply never done.

A landscaping quote is the only place the invisible part of your garden exists on paper. Once the job is finished you cannot inspect the sub base, the drainage or the bedding. The quote is your single opportunity to check they were ever priced.

If you’re planning a project of your own, see how we handle garden design and landscaping in Glasgow, from first idea to final planting.

This guide reads a quote line by line, shows you what should be there, what is commonly missing, and how to compare three prices fairly. We build gardens across Glasgow and the Central Belt and have done for 19 years.

First, the two words that change everything

Estimate is an approximate figure. It can change, and it carries no commitment.

Quotation is a fixed price for clearly described work. It is binding for the work described.

If the document at the top says “estimate”, you do not have a price. You have an opinion. Ask for a written quotation before you compare anything.

The anatomy of a good quote

A quote you can actually rely on contains these eleven things. Use it as a checklist against each document in front of you.

SectionWhat it should contain
Business detailsFull trading name, registered address, company number if limited, contact details
Your detailsYour name and the site address
Date and validityWhen it was issued and how long the price holds, often 30 days
Scope of worksAn itemised list of what will be done, in order
SpecificationMaterials named, sub base depth, bedding method, falls
ExclusionsWhat is specifically not included
Provisional sumsAny allowances, clearly labelled, with what could change them
Total priceAnd whether VAT is included, excluded, or not applicable
Payment termsDeposit amount and stage payments
TimescaleExpected start and duration
GuaranteeWhat is covered and for how long

A quote missing four or five of these is not automatically bad work. It just leaves you with no way to judge it against anything else.

Reading the scope of works, line by line

This is the heart of the document. Here is a well written example for a patio, with each line translated.

What it says:

“Excavate 45m² to 250mm depth, remove all spoil from site. Lay geotextile membrane. Supply and lay 150mm MOT Type 1 sub base, compacted in two layers. Supply and lay 20mm external porcelain on full mortar bed with priming slurry, laid to 1:80 fall away from property. Haunch perimeter. Install 3m ACO channel drain connected to existing gully. Joint with resin compound.”

What it means:

LinePlain EnglishWhy it matters
Excavate to 250mmDigging a proper depth, not a shallow scrapeShallow digs mean thin sub bases
Remove all spoil from siteSeveral tonnes of soil carted away, priced inOften excluded and charged later
Geotextile membraneFabric between soil and stoneStops the stone sinking into clay
150mm MOT Type 1, two layersThe right material, right depth, compacted correctlyThis is the foundation. Most cut corners live here
Full mortar bedMortar across the whole slab undersideThe correct method. Dabs cause rocking and cracking
Priming slurryBonding coat on the back of each slabWithout it, porcelain lifts later
1:80 fall away from propertyWater runs off, away from your wallLevel patios hold water
Haunch perimeterConcrete supporting the edgesStops edges dropping and spreading
ACO channel to existing gullyWater has a destinationA fall to nowhere just moves the puddle
Resin jointingDurable joints resisting weeds and washoutSand joints wash out faster

Every one of those lines is a cost. A cheaper quote for the same patio has removed some of them. Your job is to work out which.

The twelve things to look for

Run each quote against this list. Tick what is present.

  • Sub base material named, ideally MOT Type 1
  • Sub base depth stated, typically 100mm to 150mm for a patio, 150mm to 250mm for a driveway
  • Compacted in layers, not all in one go
  • Excavation depth stated
  • Spoil removal included, not sitting in the exclusions
  • Geotextile membrane
  • Bedding method stated, full mortar bed rather than spot bedding
  • Priming slurry where porcelain or dense stone is used
  • Falls stated, with a direction away from the house
  • Drainage, soakaway, land drain or channel drain where the ground is wet
  • Edge restraint or haunching
  • Finished level below the damp proof course, at least 150mm

A quote reading “supply and lay 45m² porcelain patio, £4,200” scores zero out of twelve. It might be excellent work. You have no way to know.

What is usually missing from a cheap quote

When a price looks too good, these are the items that have quietly gone.

Spoil removal. A 45m² patio dug to 250mm produces roughly eleven cubic metres of material. That is several grab lorry loads with tip charges. Leaving it out can knock several hundred pounds off a quote and it will still need doing.

Drainage. On clay, and on any site where water sits, this is not optional. It is also invisible, which is why it disappears from quotes first.

Adequate sub base depth. The difference between 50mm and 150mm of compacted stone across 45m² is a real materials and labour cost, and it is the difference between a patio that lasts twenty years and one that sinks in three.

Full bed versus dabs. Spot bedding is faster and uses less mortar. It also leaves voids that fill with water, and slabs rock, crack and lift.

Priming slurry on porcelain. A skipped step that causes slabs to debond later.

Making good. Tidying edges, adjusting manhole covers to the new level, reinstating anything disturbed.

Skip or grab hire, and access protection. Sometimes listed separately, sometimes not mentioned until the invoice.

Exclusions and provisional sums

These two sections are where quotes grow later, and both are perfectly legitimate when they are explained.

Exclusions

Read this section before the price. Common exclusions worth checking:

  • Spoil removal
  • Removal of existing concrete or hardstanding
  • Electrical connections for lighting
  • Drainage connection to public systems
  • Making good to boundary fences or walls
  • Skip permits or parking suspensions
  • Anything discovered underground

An exclusions list is a good sign, not a bad one. It means someone has thought about the job. What you must not do is skim past it and compare the headline figure against a quote that includes those items.

Provisional sums

A provisional sum is an allowance for work whose extent cannot be known until digging starts. Ground conditions are genuinely unknowable. Old concrete, buried rubble, a drain nobody expected.

Two questions to ask about any provisional sum:

  1. What would make this change, and in which direction?
  2. Roughly what does a worst case look like?

A landscaper who can answer both has thought it through. One who cannot has put a number in to keep the total looking attractive.

VAT, and why quotes can look further apart than they are

Not every landscaper is VAT registered. A business below the registration threshold does not charge it.

This means a quote at £6,000 from a non registered sole trader and a quote at £6,000 plus VAT from a registered firm are £1,200 apart in what you actually pay.

Always check whether the total is inclusive of VAT, exclusive of VAT, or whether VAT does not apply. If it is not stated, ask, and compare like for like.

Payment terms: read this section carefully

The structure of payments protects you more than the total price does.

PaymentTypicalWarning sign
Deposit10 to 30% on bookingAbove roughly a third, or full payment upfront
Stage paymentsTied to completed workTied to dates rather than progress
Final balance15 to 25% on completionRequested before the job is finished

Stage payments should be tied to completed work, not to the calendar. “Payment on completion of groundworks and sub base” is right. “Payment at end of week two” is not, because it pays regardless of what has been built.

Keep your final balance until you have walked the finished garden. It is your only leverage for snagging.

Comparing three quotes without getting lost

Step one: check they are pricing the same job

Send all three the same written brief with the same measurements, the same materials and the same scope. Different briefs produce prices that cannot be compared.

Step two: normalise them

Build a simple table.

ItemQuote AQuote BQuote C
Headline price£4,200£6,800£9,500
VATNot registeredPlus VATIncluded
Actual payable£4,200£8,160£9,500
Excavation depthNot stated250mm250mm
Sub baseNot stated150mm Type 1150mm Type 1
BeddingNot statedFull bedFull bed
DrainageNot mentionedChannel drainChannel drain and soakaway
Spoil removalExcludedIncludedIncluded
GuaranteeNone stated2 years5 years

Once laid out this way, the £4,200 quote stops looking like a bargain and starts looking like a different job. The gap between B and C is now a real comparison: soakaway, guarantee length, and perhaps material quality.

Step three: interrogate the outlier

If one quote is dramatically lower, put four questions to that landscaper:

  1. What sub base material and depth are you using?
  2. Where does the water go?
  3. Is the paving going on a full bed or spot bedded?
  4. Is spoil removal in the price?

Compare their answers to the other two. You will usually have your explanation within five minutes.

Red flags on the document itself

Walk away:

  • No written quote at all, only a figure said out loud
  • No business name or address
  • Full payment or more than a third demanded upfront
  • Cash only, no invoice
  • A price that expires today

Ask hard questions:

  • Single lump sum with no breakdown
  • No mention of sub base, drainage or falls anywhere
  • Large provisional sums with no explanation
  • A long exclusions list that quietly covers half the job
  • No guarantee stated

Fine, and normal:

  • Some items excluded, clearly listed
  • A provisional sum for groundworks, explained
  • A price valid for 30 days
  • Materials listed as a prime cost allowance, if you have not chosen them yet

Questions to ask when the quote arrives

Six questions, five minutes, and you will know what you are buying.

  1. Is this a quotation or an estimate?
  2. Is VAT included, excluded, or not applicable?
  3. What sub base depth and material, and is it compacted in layers?
  4. Is the paving on a full mortar bed?
  5. Where does the water go, and is drainage included?
  6. What is provisional here, and what would change it?

A good landscaper will answer all six immediately and specifically. Detailed answers are how they justify costing more than the outfit quoting half the price for half the build up. Vagueness on questions three and five is the signal to pay attention to.

Frequently asked questions

What is the difference between a quote and an estimate?

A quotation is a fixed price for clearly defined work and is binding for that work. An estimate is an approximation that can change. Always ask for a written quotation.

Should a landscaping quote be itemised?

Yes. Groundworks, drainage, materials and labour should be separated out. A single lump sum gives you no way to compare quotes or to understand what changes if you alter the scope.

Why are landscaping quotes so different from each other?

Usually because they describe different jobs. Differences in excavation depth, sub base thickness, drainage, bedding method and whether spoil removal is included can account for thousands on the same visible finish.

What is a provisional sum on a garden quote?

An allowance for work whose extent is unknown until digging starts, most often groundworks. It is legitimate, but you should ask what could change it and roughly by how much.

Do landscapers charge VAT?

Only if the business is VAT registered. Below the registration threshold, no VAT is charged. Always check whether a total includes it before comparing quotes.

How much deposit is normal on a landscaping quote?

Usually 10 to 30% on booking, to secure materials and your slot. Anything above roughly a third needs a clear explanation, and full payment upfront is never necessary.

What should I do if the cheapest quote is missing detail?

Ask for it. A landscaper who is building it properly will happily confirm sub base depth, bedding method and drainage. If the detail is added and the price then rises to match the others, you have your answer.

Is it reasonable to ask a landscaper to change their quote?

Yes. Asking for full bed instead of spot bedding, or for spoil removal to be included, is a normal negotiation. You are agreeing the specification, not haggling.

How long should a quote be valid for?

Typically 30 days. Material prices move, so a quote from four months ago may need revisiting. This is normal and not a sign of anything untoward.

What should I keep once I accept a quote?

The itemised quotation, any variations agreed in writing during the build, receipts for every payment, and the guarantee terms. Keep them together in case anything needs raising later.

The short version

Three numbers on three pieces of paper tell you almost nothing. The same three quotes, laid out in a table with sub base depth, drainage, bedding method, spoil removal and VAT status filled in, usually tell you everything within ten minutes.

And if a quote does not contain that detail, that is not a gap in the paperwork. It is a gap in the job.

If you have quotes in front of you and they are not making sense, we are happy to look at what your garden actually needs and give you a written, itemised price you can hold up against them. Nineteen years, family run, building gardens across Glasgow and the Central Belt.