Most of these checks cost nothing but a phone call. Skipping them is what turns a straightforward garden build into a stalled site, an unexpected bill, or in one case a legal problem.
The one that gets missed most often is tree protection status. People assume a Tree Preservation Order is something that applies to grand old oaks in parks. In reality a perfectly ordinary garden tree can be covered, and unauthorised work on a protected tree, including root damage from digging a patio, can lead to substantial fines.
Here is what to confirm before you get quotes, what happens when each one is skipped, and roughly what the consequence costs.
Check 1: Tree protection status
The most commonly skipped, and potentially the most serious.
What you need to find out
Whether any tree in or near your garden is covered by a Tree Preservation Order, and whether your property sits in a conservation area.
A TPO is made by the local planning authority and protects a specific tree or group of trees. If one applies, you need written consent from the council before cutting, lopping, uprooting or wilfully damaging the tree. That includes root damage from excavation, not just work on the branches.
In a conservation area, trees above a certain size are protected whether or not a TPO exists, and you must give the council written notice, normally six weeks, before carrying out work.
Why it gets missed
Nobody expects an ordinary garden tree to be protected. People check before felling a tree and do not think to check before building a patio near one, even though the root damage can be just as damaging and just as unlawful.
What goes wrong
- Fines, which can be significant for unauthorised work on a protected tree
- An enforcement notice requiring replacement planting
- Work stopping mid project while consent is sought
- A design that has to be reworked around a tree you assumed you could remove
How to check
Phone your local council’s planning department. Ask whether any tree on your property is covered by a TPO and whether the property is in a conservation area. Many councils publish TPO maps online, though coverage varies.
Note who you spoke to and when.
Do this before you design, not before you dig. Finding out mid project that a tree is protected means redesigning under time pressure.
Check 2: Drains, services and manholes
The one that stops work dead when it goes wrong.
What you need to find out
Where the drains run, where manholes and inspection chambers sit, and the routes of gas, water and electricity supplies.
Why it matters
Striking a service is the fastest way to turn a garden project into an emergency. A severed water main floods the site. A cut electricity supply is dangerous and expensive. A damaged drain run means a repair before anything else can continue.
Unmapped services are one of the most expensive things we find mid dig, because the work stops entirely while it is dealt with.
How to check
- Walk the garden and find every manhole and inspection cover. Lift them if you can and note which way the pipes run
- Look at where pipes leave the house. Downpipes, soil stack, kitchen and bathroom waste
- Push a metal rod into the ground along suspected runs, which gives a rough picture
- Think about history. An extension, a conservatory or a previous outbuilding usually means a service run you cannot see
- Ask the utility companies for plans if anything significant is being dug
Mention what you know to anyone quoting. A landscaper who knows a drain crosses the patio area will design around it rather than discover it.
A related point
Manhole covers need to finish level with the new surface. Raising or adjusting them is normal work, but it should be in the quote. If it is not mentioned, ask.
Check 3: Buried concrete and old foundations
The item that most commonly adds days to a job.
What you need to find out
Whether anything solid is buried under your garden. Old patios, shed bases, greenhouse foundations, a filled in pond, a demolished outbuilding, or general building rubble from a previous development.
Why it matters
Excavating through buried concrete is slow, often needs a breaker, and produces material that has to be removed and disposed of. A dig that was priced as two days can become four.
On newer properties, made ground is the common version: the plot was backfilled with construction waste rather than soil, so there is rubble throughout rather than one discrete obstruction.
How to check
- Push a long metal rod or screwdriver into the ground at intervals across the area being worked. If it stops abruptly in one place and goes in freely a metre away, something is buried
- Look for clues on the surface. A rectangle of thinner grass often marks an old base. Bare patches that never fill in frequently sit over debris
- Think about what was here before. Previous owners, aerial photographs, and what the neighbours remember
- Dig a trial hole or two in the area where the main work will happen
Tell your landscaper what you find. It is far better for an obstruction to be priced in as a known quantity than discovered on day two.
Check 4: Ground level against the house
Ten minutes, and it prevents the most common wet weather problem there is.
What you need to find out
How far your current ground level sits below the damp proof course.
The DPC is the waterproof barrier in your house wall, usually visible as a thin line of different material a couple of brick courses above ground level. It stops moisture rising into the wall, and it only works if nothing bridges over it.
The rule
Finished ground level should sit at least 150mm below the DPC.
Why it matters
If paving, soil or gravel is built up to or above the DPC, water can travel from the ground into the brickwork above the barrier. The result is damp inside a wall that was previously dry.
This is common on newer properties, where the plot was backfilled with site spoil and the ground ended up level with or above the DPC. It looks fine in summer and causes problems the first wet winter.
How to check
- Find the DPC line on your external wall
- Measure from it down to current ground level
- If the gap is under 150mm, ground needs to come down before anything is built on top
What goes wrong if skipped
Building a patio on ground that is already too high makes the problem permanent. Fixing it afterwards means lifting the patio, excavating, and relaying. That is one of the most expensive mistakes on this list, and it is also one of the easiest to avoid.
If a landscaper does not raise this on a newer property, raise it with them.
Check 5: Boundary ownership
What you need to find out
Which fences and walls are yours, where the boundary line actually sits, and whether your title deeds contain any restrictions.
Why it matters
Replacing a fence that belongs to your neighbour, building on their side of the line, or altering a shared boundary without agreement are all common sources of dispute. In the worst cases work has to be taken down.
A tree belongs to whoever owns the land the trunk grows on, regardless of where the branches or roots reach. You may generally cut back growth crossing onto your property, up to the boundary line, but not in a way that kills or destabilises the plant, and not at all if the tree is protected.
How to check
- Read your title deeds. They may specify boundary responsibility
- Look at the fence posts. As a rough guide, posts and rails usually face the owner’s side, though this is a convention rather than a rule
- Talk to your neighbour. Early, and before anything is agreed with a contractor
Almost every boundary dispute we have come across started with somebody not having that conversation. Five minutes beforehand prevents months of difficulty.
Check 6: Planning permission and building warrants
What you need to find out
Whether what you are planning needs consent.
Usually fine without permission
Patios, paths, planting, and replacing like for like.
May need consent
- Raised decking above a certain height
- Fences and walls above permitted heights, with tighter limits where a boundary adjoins a road
- Hard surfacing in front gardens, in some circumstances
- Anything on a listed building or in a conservation area
- Work affecting protected trees
- Larger garden structures
The Scottish difference
Planning permission and building warrants are separate things in Scotland, and the rules differ from England. Building warrants are handled by your local council’s building standards department.
Do not rely on UK wide guidance. Phone your own council, ask the specific question, and note who you spoke to.
What goes wrong if skipped
An enforcement notice requiring you to remove what you built. Expensive, and entirely avoidable for the cost of a phone call.
Check 7: Access width
The check that affects the price more than almost anything else.
What you need to find out
The width of your side access at its narrowest point, whether the gate can be removed, and whether there is any alternative route.
Why it matters
Most of a garden build is moving material. Several tonnes of spoil out, several tonnes of sub base and surfacing in. How that material travels determines how many days the job takes, and labour is the largest cost in any build.
| Access | Effect on the job |
|---|---|
| Wide gate, machine access | Fastest and cheapest |
| Narrow path, barrow only | Noticeably slower |
| Through the house | Can double the days on site |
Through the house is the one people do not anticipate. Spoil cannot be barrowed through a hallway. It goes in buckets or tonne bags, carried by hand, with floor protection throughout.
How to check
Measure the narrowest point with a tape. Check whether the gate posts can come out temporarily. Ask whether removing a fence panel would open a route from a neighbour’s garden or a lane.
Mention it when you first enquire. A landscaper who has priced on machine access and then finds a hallway route will have to revise, and nobody enjoys that conversation.
Check 8: Where water sits
What you need to find out
Whether water pools anywhere after heavy rain, and how long it takes to clear.
How to check
Go out during heavy rain, or the morning after, and note where water sits. For a more useful answer, dig a hole roughly 300mm square and 300mm deep, fill it with water, let it drain, then fill it again and time how long it takes to empty.
| Drain time | What it means |
|---|---|
| Under 4 hours | Reasonable |
| 4 to 12 hours | Slow |
| 12 to 24 hours | Poor |
| Over 24 hours | Waterlogged, drainage needed first |
Test in winter, or at least after prolonged rain. Clay tested in a dry spell gives a flattering result because it has cracked open.
Why the timing matters
Drainage installed during a build costs a fraction of drainage retrofitted under a finished patio, because retrofitting means lifting the patio, rebuilding the sub base and relaying.
If water sits in your garden, that is a cost, and it is a cost that comes before anything else.
When to do all this
Before you get quotes, not after.
A landscaper quoting a garden with a protected tree, an unmapped drain, buried foundations and ground levels above the DPC will price it one way if they know and another way if they find out on day three. The second version involves a difficult conversation and a revised figure.
Doing these checks first means:
- Quotes are accurate rather than provisional
- You can compare quotes fairly
- Nothing stops the job mid build
- You are not making decisions under time pressure
A note on contingency
Even with every check done, ground conditions cannot be fully known until digging starts. Set aside 10 to 15% of the project cost as contingency. On older properties or sloping sites, lean toward 15%.
That turns a surprise into an inconvenience rather than a stalled project.
Frequently asked questions
What checks should I do before starting a garden project?
Confirm tree protection status with your council, locate drains and services, probe for buried concrete, measure ground level against your damp proof course, check boundary ownership, confirm whether you need planning permission or a building warrant, measure your access width, and observe where water sits after rain.
How do I find out if a tree has a Tree Preservation Order?
Phone your local council’s planning department and ask directly. Also ask whether your property is in a conservation area, where trees above a certain size are protected regardless of whether a TPO exists.
Do I need permission to build a patio?
Usually not. Raised decking above a certain height, tall fences and walls, listed buildings, conservation areas and work affecting protected trees are the common exceptions. Scottish rules differ from England, so check with your own council.
How do I find drains and services in my garden?
Locate and lift every manhole and inspection cover, note where pipes leave the house, push a metal rod into the ground along suspected runs, and consider where previous extensions or outbuildings stood. Request plans from utility companies for anything significant.
How far below the damp proof course should ground level be?
At least 150mm. Less than that risks water bridging over the barrier into your wall, which causes damp inside the house. This is a common problem on newer properties where plots were backfilled with site spoil.
How do I check for buried concrete in my garden?
Push a long metal rod or screwdriver into the ground at intervals. If it stops abruptly in one spot and goes in freely nearby, something is buried. Rectangles of thinner grass often mark old bases.
Who owns the fence between me and my neighbour?
Check your title deeds, which may specify responsibility. As a rough convention, posts and rails usually face the owner’s side, though this is not a rule. Speak to your neighbour before altering anything on a shared boundary.
Should I do these checks or leave it to the landscaper?
A good landscaper will raise most of them, but the responsibility for permissions and boundaries sits with you as the property owner. Doing them first means quotes are accurate and nothing stops the job mid build.
How much contingency should I allow?
Ten to fifteen per cent of the project cost, leaning toward fifteen on older properties or sloping sites. Ground conditions cannot be fully known until digging starts, even with every check completed.
When should I do these checks?
Before getting quotes. A landscaper pricing a garden with known conditions gives you an accurate figure. One discovering them on day three gives you a revised figure and a delay.