Skip to main content

Lanky Landscaping

Getting the Best From Your Garden Designer

Garden Designer

Some clients end up with gardens they love. Others end up with gardens that are technically what they asked for and somehow not what they wanted.

The difference is rarely the designer. It is almost always what happened in the conversations.

Three habits separate the two groups: being honest about budget from the start, being honest about how much maintenance you will actually do, and saying when you do not like something while it is still a drawing. None of them are difficult. All of them are things people avoid out of politeness.

This guide covers how to work with whoever is designing your garden so you get a result that suits you rather than one that suits a catalogue. We work across Glasgow and the Central Belt, so the examples assume Scottish conditions throughout.

Be upfront about the budget

The most useful thing you can say in a first conversation, and the one people most often dodge.

Why withholding it backfires

The fear is understandable: say £15,000 and the design will cost £15,000. In practice the opposite happens.

Without a figure, a designer is guessing. They either design something that turns out to be twice your budget, which wastes everyone’s time and means starting again, or they play safe and design something modest when you could have afforded more.

Budget is not a constraint on creativity. It is information about scope. It tells the designer whether you are talking about the whole garden or part of it, whether phasing makes sense, and which materials are in the conversation.

What to say

  • The figure you have, or a range if that is more honest
  • Whether it is firm or has some flexibility
  • Whether you would consider phasing over two or three years
  • What you would rather sacrifice if something has to go

“We have about £12,000, we would rather do half the garden properly than all of it thinly, and we could do the planting next year” is a brief in one sentence. It tells a designer more than an hour of looking at photographs.

The thing worth understanding about where money goes

Roughly 40% of a garden budget disappears into things you will never see. Excavation, spoil removal, drainage, sub base and footings.

This is why a designer may seem to be spending your money on nothing. On a wet or sloping site in the Central Belt, the invisible share goes higher still. Knowing this in advance makes the conversation about budget far less frustrating.

Be honest about maintenance

The question people answer optimistically, and the one that determines whether they enjoy the garden in three years.

Everybody overestimates by about one level. It is not dishonesty, it is the natural optimism of someone standing in a garden on a nice day imagining a better version of themselves.

What you sayWhat usually happens
“I’d love to get into gardening”The beds are neglected by year two
“I don’t mind a bit of upkeep”An hour a month, at most
“I want it low maintenance but with lots of colour”Those two things pull against each other

Why this matters more than it sounds

A designer who believes you will spend two hours a week in the garden will design mixed borders, seasonal planting and a lawn. A designer who knows you will spend an hour a month will design structural evergreen planting, raised beds, and surfaces that need a wash twice a year.

Both are good gardens. Only one of them will still look good when you do not maintain it.

How to answer honestly

Think about what you currently do, not what you intend to do. Have you maintained a garden before? Did you enjoy it? What happened to your last set of pots?

Be specific about the time you will give:

  • Almost none: paving, structural evergreens, mulched beds, possibly artificial grass
  • An hour a month: composite decking, raised beds, slow growing shrubs
  • An hour a week: lawn, mixed perennial planting, some seasonal work
  • Several hours a week, happily: anything you like

A designer would far rather hear “almost none” than discover it later. It is not a judgement, it is a design input.

Say when you do not like something

The habit that saves the most grief, and the one politeness gets in the way of.

Why people hold back

Somebody has put effort into an idea. It feels rude to reject it. So the client nods, the idea goes into the plan, and the objection surfaces three months later when it is built.

A designer would overwhelmingly rather hear an objection now. Changing an idea on paper costs nothing. Changing a built garden costs thousands.

How to object usefully

The least helpful feedback is “I’m not sure about it”. The most helpful is specific.

Instead ofSay
“I don’t like it”“The seating area feels too far from the house”
“It’s not quite right”“I don’t like how dark that paving looks”
“Maybe something different?”“Could we lose the water feature and spend it on planting?”
“Whatever you think”“I’d rather have fewer, larger plants”

You do not need design language. Describing how something makes you feel, or what you would use less, is perfectly useful information.

Mark it out before you commit

The single most effective way to catch problems early: mark the layout at full size on the ground with sand, spray paint or canes, and walk it.

Sit in the marked seating area at the time of day you would use it. Walk the routes. Check you can see the play area from the kitchen.

Problems invisible on paper become obvious in twenty minutes on the ground. This is also the easiest moment to say “actually, this feels wrong”, because nothing has been committed.

When to trust the advice, and when to object

Not every disagreement is equal. Some are matters of taste, where your view should win. Some are matters of how the ground behaves, where it should not.

Trust them on these

Anything below ground. Sub base depth, drainage, footings, falls. You cannot see these, they are structural, and getting them wrong means lifting finished work. If a designer says the site needs drainage before anything else, that is not an upsell.

Material performance in our climate. Which surfaces go slippy in a shaded Glasgow winter, which stone is frost proof, which decking rots. This is experience, not opinion.

What will survive on your soil. If you are told lavender will not survive your clay, that is not a preference. It is what happens.

Sequencing. Why drainage goes first, why planting goes last, why changing your mind in week three is expensive.

Scale and proportion. If you are told the seating area needs to be bigger than you think, measure your table and chairs. It usually does.

Push back on these

Anything to do with how you will use the space. You know your household. If a designer has put the dining area somewhere you would never eat, say so.

Aesthetics. You are looking at this garden every day. If you dislike a material, that is a legitimate and final objection.

Maintenance level. If a scheme looks like more work than you will do, raise it. A designer may have over estimated your appetite because of something you said early on.

Budget allocation. If a large part of the money is going on something you do not care about, say which parts you would rather spend it on.

Anything that does not match the brief you gave. If you said low maintenance and you are looking at deep mixed borders, ask why.

How to disagree without derailing it

Ask why before objecting. Sometimes there is a reason you have not thought of, often drainage or light related.

Separate taste from function. “I don’t like that” is final and legitimate. “I don’t think that will work” is a question worth exploring.

Raise it once, clearly, early. Repeated small objections through a project are harder to work with than one clear conversation.

Do not change your mind back and forth. Mid build indecision is where budgets break.

How designers charge

Worth understanding, because the fee structure affects how the relationship works.

ModelHow it worksWhat it suits
Design only, fixed feeA fee for the design, you then find a contractorLarger or complex gardens
Design only, percentageFee as a percentage of the build costBigger projects
Hourly or consultationPaid for time, often a one off visit and adviceSmall gardens, or guidance on a specific problem
Design and buildOne company designs and constructs, design often folded into the projectMost domestic gardens
Free design with the buildDesign advice included as part of winning the workCommon in domestic landscaping

The practical difference: with design only, you get a plan and then have to find someone to build it, which can reveal that the plan costs more than expected. With design and build, the person drawing it is the person pricing it, so the design and the budget stay connected throughout.

One thing worth asking in either case: who will actually be on site? Some firms quote with one person and build with subcontractors nobody has met. That is not automatically a problem, but you should know before the van arrives.

What a good designer should be asking you

A useful signal, early on. If the first visit is mostly about materials and photographs rather than questions, something is missing.

Expect to be asked:

  • What will you do in this garden most weeks?
  • How many people need to sit down at once?
  • Who uses the garden, and how old are they?
  • Where does water sit after rain?
  • How much maintenance do you want?
  • What is the budget?
  • What do you currently hate about it?
  • What can you see from the kitchen window?
  • Is there anything that absolutely has to stay?

And they should be looking at the ground, not just the space. Levels, drainage, soil, access, light. The survey matters more than the drawing, and a designer who skips it is designing blind.

What to have ready

You do not need a brief document. You do need to have thought about a few things.

  • Two or three uses for the garden, not six
  • A budget figure, with a note on whether phasing is an option
  • An honest maintenance answer
  • Any non negotiables, such as a tree that stays or a shed that has to go somewhere
  • Images you like, with a note on what specifically you like about each. “This colour”, “this feeling”, not just the whole photograph
  • Images you dislike, which are often more useful
  • Access measurements, the width of your side gate at its narrowest point

The images point is worth expanding. A folder of photographs tells a designer very little without annotation. The same folder with “I like how open this feels” and “this planting is too fussy for me” written on it is genuinely useful.

Through the build

The relationship does not end when the design is agreed.

  • Stay available. Questions arise, and a quick answer keeps things moving
  • Decide quickly. A day waiting for a decision is a day lost on site
  • Raise concerns the same day. Everything is easier to fix before the next layer goes on
  • Expect some provisional items to move. Ground conditions cannot be fully known until digging starts, which is why a 10 to 15% contingency is sensible
  • Do not keep changing things. The most expensive habit available to a client
  • Agree changes in writing, with a price, before the work is done

Frequently asked questions

Should I tell a garden designer my budget?

Yes, and early. Without it a designer is guessing, which usually means designing something you cannot afford or something more modest than you could have had. Budget tells them the scope, not the ceiling on their creativity.

Do I need a landscape designer or just a landscaper?

For most domestic gardens, a landscaper who handles design and build together is sufficient and avoids the gap where a plan turns out to cost more than expected. Separate designers suit larger or more complex projects.

How do garden designers charge?

Usually a fixed design fee, a percentage of the build cost, an hourly consultation rate, or design folded into a design and build project. Each affects how closely the design and the budget stay connected.

What should I tell a designer at the first meeting?

How you will use the garden, your budget, how much maintenance you will realistically do, anything that has to stay, and what you currently dislike. Those five things shape the design more than any image folder.

Is it rude to reject a designer’s idea?

No, and holding back is far worse. Changing an idea on paper costs nothing. Changing a built garden costs thousands. Be specific about what you do not like rather than vague.

When should I trust the designer over my own instinct?

On anything below ground, how materials perform in our climate, what will survive on your soil, and the order work happens in. Those are experience rather than opinion. On aesthetics and how you use the space, your view should win.

What if the design costs more than my budget?

Say so immediately rather than hoping it works out. Usually the answer is reducing the area and building it properly, or phasing the work over two or three years, rather than compromising the specification.

How honest should I be about maintenance?

Completely. Almost everyone overestimates by one level. Think about what you currently do rather than what you intend to, because a scheme designed for two hours a week will look neglected if it gets one hour a month.

Can I change the design once work has started?

Small changes are usually manageable. Significant ones are expensive, because completed work may need undoing. Any change should be agreed in writing with a price before it is carried out.

What should I prepare before the first visit?

Two or three uses for the garden, a budget figure, an honest maintenance answer, annotated images of what you like and dislike, and the width of your side access at its narrowest point.

The short version

Trust the advice on drainage, materials and sequencing, because that is experience. Hold your ground on aesthetics and how you use the space, because that is your life.The clients who end up with gardens they love are not the ones with the biggest budgets or the clearest vision. They are the ones who had honest conversations early, when changing things was still free.